Road and Infrastructure ­ Industrial Package 3

Client: Ashghal

Duration: 24 Months

Scope: Water Treatment-Monitoring System


Project Details: UH has been hired to design, implement, operate and treat the pumped water which has been contaminated by high values of TSS, Ph, BOD, COD and manganese.